- Home Page /
- Industrial Supplies /
- Hydraulics, Pneumatics & Plumbing /
- Fittings /
- Pipe Fittings /
- Aqua Pro 69717 9 12 Long Magnesium Anode Rod ...
Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread
XAF 16224
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Protect your water heater from corrosion with the Aqua Pro 69717 lead-free magnesium anode rod.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
- Lead-free Aqua Pro 69717 magnesium anode rod
- Suitable for suburban and MorFlo water heaters
- Measures 9 inches in length
- Features a 3/4 inch male pipe thread
- Comes in bulk packaging for convenience
- Helps prevent corrosion in water heaters
| Item Weight | 1.2 lbs (540 grams) |
Who Should Buy?
-
Water Heater Owners
Ideal for users wanting to extend the life of their water heater by preventing corrosion.
-
DIY Enthusiasts
Perfect for those who enjoy home maintenance projects and prefer replacing anode rods themselves.
-
Eco-Conscious Users
Suitable for environmentally friendly individuals looking to reduce their overall utility costs over time.
-
Professional Installers
Not recommended for those who require heavier and more durable commercial-grade anode rods for extensive applications.
Product Description
Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread
About This Item
Introducing the Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread - the ultimate solution for protecting your water heater from corrosion and extending its lifespan. Crafted with high-quality lead free magnesium, this anode rod works tirelessly to prevent the build-up of rust and scale inside your water heater tank, ensuring efficient performance and optimal water quality. The 9 1/2" length of this anode rod is designed to fit most standard water heaters, providing maximum coverage and protection.
With a 3/4" male pipe thread, installation is a breeze and you can start enjoying the benefits in no time. Not only does this anode rod effectively safeguard your water heater, but it is also an environmentally friendly option. As it is lead-free, you can have peace of mind knowing that your water supply remains safe and free from harmful contaminants.
Ideal for both residential and commercial applications, the Aqua Pro 69717 Magnesium Anode Rod is a reliable choice for both new installations and replacements. Its durability and longevity make it a cost-effective investment that will save you time and money in the long run. Don't wait until it's too late - protect your water heater with the Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread.
Trust in Aqua Pro, the industry leader in water treatment solutions, to deliver exceptional performance and quality. Upgrade your water heater today and experience the difference!.
Customer Questions & Answers
-
Question:
What is the Aqua Pro 69717 9 12 Long Magnesium Anode Rod used for?
Answer: The Aqua Pro 69717 long magnesium anode rod is designed to prevent corrosion in water heaters. It works by attracting corrosive elements present in the water, which helps protect the inner tank from rust and extend the life of the water heater. This rod is essential for those looking to maintain their hot water systems and avoid costly replacements. For instance, if you live in an area with hard water, using this magnesium anode can significantly reduce the rusting process, ensuring your water heater operates efficiently. -
Question:
How do I install the Aqua Pro 69717 Magnesium Anode Rod?
Answer: Installing the Aqua Pro 69717 anode rod is a straightforward process. First, you will need to drain some water from your water heater to relieve pressure. Next, locate the anode rod port, typically at the top of the unit, and remove any old anode using a wrench. Then, simply screw in the new magnesium anode rod using the 3/4 male pipe thread until secure. This installation can significantly enhance the longevity of your heater, especially if done regularly as part of maintenance. Always ensure to check your water heater’s manual for specific installation instructions. -
Question:
What are the benefits of using a magnesium anode rod over other materials?
Answer: Magnesium anode rods such as the Aqua Pro 69717 are preferred by many homeowners because they are more effective at combating corrosion compared to aluminum or zinc rods. Magnesium provides superior cathodic protection, meaning it can better prevent rust formation, thereby prolonging the life of your water heater. This is particularly beneficial in regions with high water mineral content. By investing in a magnesium rod, you can significantly reduce the risk of damage from corrosion, leading to a more reliable hot water supply. -
Question:
How often should I replace the Aqua Pro Magnesium Anode Rod?
Answer: It is advised to check your Aqua Pro magnesium anode rod annually, and replace it every 3 to 5 years, depending on water quality and usage. Factors such as water hardness and temperature can affect the longevity of the rod. If you notice a significant decrease in water heater efficiency or find corrosion or discoloration, it’s time for a replacement. Regular checks not only ensure optimal performance but also save you from expensive repairs due to corrosion damage. -
Question:
Is the Aqua Pro 69717 suitable for all types of water heaters?
Answer: The Aqua Pro 69717 magnesium anode rod is compatible with a variety of water heater types, including gas and electric models. However, it’s essential to verify that your water heater has the right fitting for the 3/4 male pipe thread before purchase. Utilizing this rod in compatible units can enhance protection against corrosion, especially in older water heaters. If you're unsure about compatibility, consult your water heater's manual or a professional for guidance. -
Question:
What makes the Aqua Pro 69717 different from other anode rods?
Answer: The Aqua Pro 69717 distinguishes itself with its long magnesium construction, designed specifically to offer robust corrosion protection for extended periods. Unlike many other anode rods that may use zinc or aluminum, this magnesium rod enhances performance by better forgoing electrolytic action, ensuring a longer lifespan for your water heater. It is particularly advantageous for those living in areas with hard water, where conventional rods may not provide sufficient protection. This makes the Aqua Pro 69717 a preferred choice for homeowners focused on durability. -
Question:
How can I tell if my anode rod needs replacement?
Answer: Signs that your Aqua Pro magnesium anode rod needs replacement include a decrease in hot water heater efficiency, a rotten egg smell in water, or visible corrosion on the rod itself. Additionally, if you notice rust in your hot water or suspect sediment buildup, it’s a good idea to check the anode rod. Regular inspection helps maintain both your water heater's efficiency and your water quality. If the rod is significantly diminished (less than 1/2 inch thick), it's time to replace it to avoid further damage. -
Question:
Can I use an anode rod in a tankless water heater?
Answer: Anode rods are generally not used in tankless water heaters as these systems are designed to heat water on-demand and do not have the same corrosion concerns as traditional storage tanks. However, maintaining your tankless water heater involves regular flushing to avoid mineral buildup. If you are uncertain, consult the manufacturer’s instructions or a professional technician. While this might not be a concern for tankless units, ensuring overall maintenance is key to performance longevity. -
Question:
What should I do if my water heater smells like rotten eggs?
Answer: A rotten egg smell often indicates the presence of hydrogen sulfide, which can occur as a reaction with certain water heater anode rods. If you detect this odor, especially in stored hot water, it may be time to check or replace your Aqua Pro magnesium anode rod. Since hydrogen sulfide can be corrosive and affect both the taste and safety of the water, it's imperative to address the issue promptly. Switching to a magnesium anode rod could mitigate the smell and improve water quality. -
Question:
Where can I buy the Aqua Pro 69717 9 12 Long Magnesium Anode Rod?
Answer: You can purchase the Aqua Pro 69717 9 12 Long Magnesium Anode Rod from Ubuy. They offer a convenient online shopping experience, allowing you to find your desired product easily and securely. Ubuy provides access to international delivery along with a wide range of home improvement products, making it an excellent choice for your anode rod needs in Central African Republic.
Aquapro Pipe Fittings Editorial Review
The Aqua Pro 69717 9 12 Long Magnesium Anode Rod with 34 Male Pipe Thread has garnered mixed feedback from customers, highlighting both its practicality and potential compatibility issues. Many users appreciate its effectiveness in prolonging the lifespan of water heaters by preventing rust, which underscores its value as an essential component for those starting their camping season. The product is noted for its sturdy Construction and competitive pricing compared to manufacturer options, with several users expressing confidence in purchasing it again. However, there are reports of dissatisfaction related to fitting issues, with one customer finding that the anode rod did not fit their water heater at all. This inConsistency suggests that while many find this product to perform well, potential buyers should double-check compatibility with their specific water heater model to avoid disappointment. Overall, the Aqua Pro anode rod appears to be a solid choice for those looking to maintain their water heating systems effectively, provided they verify fitment beforehand. **
Customer Reviews & Ratings
-
5 Star
100%
-
4 Star
0%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Pros
- Effective in preventing rust and prolonging water heater lifespan
- Sturdy Construction
- Cost-effective compared to manufacturer products
- Generally positive performance reviews
Cons
- Uncertainty about long-term durability
Platform Trust & Buyer Confidence
“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”
“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”
“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”
“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”
“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
XAF 16224
Order now and get it around Thursday, August 13
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.